Saturday, 28 July 2012

CONSTRUCTION PROCESS - DAY 2

BUILDING THE RAILS: 

  1. Cut suspension tube roughly the length of each rail (Figure 8).
  2. Clamp suspension to the rail (Figure 9).













  3.  Mark centre points on suspension for the nails (Figure 10).
  4.  Pierce suspension with a sharp nail (Figure 11). 













  5.  Thread suspension tubing over each nail (Figure 12, 13). 












NOTE: Waiting for blanking caps to arrive in the mail. Without the rubber caps the bars cannot be fitted and the frame cannot be aligned.

No comments:

Post a Comment