Thursday, 9 August 2012

CONSTRUCTION PROCESS - DAY 8

MAKING MALLETS:

Other than the instrument itself, the mallets you use are the biggest contributor to the sound you get. The hardest head creates the brightest and most brittle sound. The size and density of the head will change the tone and pitch of the mallet when used on the instrument.

   1.  Measure and mark the length of the shafts (250mm) (Figure 66).
   2.  Mark area that needs to be shaved down (Figure 67).













   3.  Cut dowel using stanley knife (Figure 68).
   4.  Sand end using disk sander (Figure 69).













   5.  Feed dowel into drill press and sand while spinning (Figure 70).
   6.  Widen the core of the bead with a 3.5mm drill bit (Figure 71).













   7.  Attach wooden bead to the end of the dowel, it should be a very tight fit (Figure 72).   
   8.  Mallets complete! (Figure 73). 
 




Wednesday, 8 August 2012

CONSTUCTION PROCESS - DAY 7

ADDING THE BASE: 
  
    1.   Place frame on pine base (Figure 56) and trace around edges (Figure 57).












    2.  Cut base using bandsaw (Figure 58).
    3.  Measure and mark points for tacks (evenly spaced 10mm from the outside edge) 
         (Figure 59).












4.   Using a tack hammer nail in tacks (Figure 60 - 62).














   5.  Case complete! (Figure 63).













   6. Slide rails back into slots (Figure 64).
   7. Hammer in pins to secure suspension and trim off any extra tubing using scissors
       (Figure 65).





Tuesday, 7 August 2012

CONSTRUCTION PROCESS - DAY 6

ADJUSTING THE RAILS:

   1.  Trim off all the excess timber from the rails using the bandsaw (Figure 48, 49).













   2.  Slide rails into slots making sure they are square with the outside frame (Figure 50, 51).













ANGLING THE INNER FRAME:

   1.  Angle inner frame to match the level of each rail, cut using bandsaw (Figure 52 - 55).















Sunday, 5 August 2012

CONSTRUCTION PROCESS - DAY 5

ALIGNING THE RAILS:

  1.  Temporarily lay rails over the main frame, the alignment is crucial. This is to ensure that 
       the spacing and angle of the slots are correct (Figure 40).
  2.  Mark where each rail is resting on the inside frame (Figure 41).
 


    3.  Measure and mark the depth of each slot on the inside frame (39mm for the two front rails 
         and 49mm for the two back rails).
    4.  Cut slots using a bandsaw and chocks to maintain correct angle (Figure 42, 43).













    5.  Carefully chisel out the inside section (Figure 44).
    6.  Slide inside frame into case (Figure 45, 46).
 












    7.  Slide rails into slots (Figure 47). 

 

Friday, 3 August 2012

CONSTRUCTION PROCESS - DAY 4

BUILDING THE CASE:

1.  Measure and mark the lengths for the outside frame, refer to blueprint for dimensions   
     (Figure 24).
2.  Square up each corner (Figure 25). 













3.  Set a 5° angle and transfer the angle onto each piece (Figure 26).
4.  Using a steel square mark a right angle along each side, (this will be a guide when you 
     are sanding) (Figure 27).












5.  Cut off excess timber using a bandsaw (Figure 28).
6.  Sand each end on a 5° angle so it will sit flush with the other pieces (Figure 29).












7.  Line up each piece to make sure they are square, use weights to hold into position  
     (Figure 30, 31).
8.  Repeat process for each end of the inner frame, using correct dimensions (Figure 31).












9.    Transfer the 5° angle as a guide for the screws (Figure 32).
10.   Extend this guide line down the side of the timber (Figure 33).












11.   Measure 20mm from each side and mark points for the screws (two screws will be 
       used in each end) (Figure 34).
12.  10G x 30mm screws, a 3.5mm and a 4mm drill bit will be used to fasten the main frame
       (Figure 35).













13.  Using a 3.5mm drill bit, drill pilot holes as a guide for each screw (Figure 36).
14.  Holding the timber firmly in position, drill two guide holes for the screws (Figure 37).
15.  Drill 4mm pilot holes in the outside pieces of timber to make it easier for the screws to 
       enter.













16.  Once the holes have been drilled - use two screws and get them started in the holes 
       (Figure 38).
17.  Power drive screws into holes (Figure 39).






Tuesday, 31 July 2012

CONSTRUCTION PROCESS - DAY 3

BUILDING THE RAILS: 

     1.  Cut the plastic tubing into 12mm pieces using a stanley knife (the tubing will be used to 
            cover each nail) (Figure 14).
     2.  Thread plastic tube onto each nail (Figure 15, 16).













NOTE: Blanking caps finally arrived in the post from Fitch Rubber (South Australia). However, they were the incorrect size (Figure 17) and had to be reshaped in order to fit through the key holes.












  
  3.  Reshape rubber caps using a disk sander (Figure 18).
  4.  Cut them to the correct length (15mm) using stanley knife (Figure 19, 20).













    5.  Place rubber blanking caps over each nail (Figure 21, 22).













    6.  Place steel bars in position, using 10mm foam as a height spacer for the back rails 
         (Figure 23).


Saturday, 28 July 2012

CONSTRUCTION PROCESS - DAY 2

BUILDING THE RAILS: 

  1. Cut suspension tube roughly the length of each rail (Figure 8).
  2. Clamp suspension to the rail (Figure 9).













  3.  Mark centre points on suspension for the nails (Figure 10).
  4.  Pierce suspension with a sharp nail (Figure 11). 













  5.  Thread suspension tubing over each nail (Figure 12, 13). 












NOTE: Waiting for blanking caps to arrive in the mail. Without the rubber caps the bars cannot be fitted and the frame cannot be aligned.